http://www.boi.go.th/english/how/typical_costs_of_starting_and_operating_a_business.asp
Sans compter les petites commissions discrètes:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Costs
Notes: - These rents are inclusive of management fees and air-conditioning
- The rent-free period ranges between one to two months
- Grade A indicates superior premises, Grade B somewhat less so.
* 4,000 m2 as example, with 200 m2 office space, Western sanitary ware/fit-ups, excludes cost of land, electric fit-up and air-conditioners.
** Includes cost of 1,000 kVA power transformer, Main and Sub Distribution panels, general lighting, wiring and receptacles.
*** Includes office, restrooms, and utility areas; however, assumes minimum 5 meter high factory/production area.
**** Grade B cement construction, 5 floors, 500 m2 per floor (2,500 m2 total), aluminum framed windows/doors, T Bar dropped ceiling for recessed lighting, Western amenities, wide modern stairwells, no lifts; includes cost for air conditioning and electrical sanitary fit-ups, but not land.
- The rent-free period ranges between one to two months
- Grade A indicates superior premises, Grade B somewhat less so.
* 4,000 m2 as example, with 200 m2 office space, Western sanitary ware/fit-ups, excludes cost of land, electric fit-up and air-conditioners.
** Includes cost of 1,000 kVA power transformer, Main and Sub Distribution panels, general lighting, wiring and receptacles.
*** Includes office, restrooms, and utility areas; however, assumes minimum 5 meter high factory/production area.
**** Grade B cement construction, 5 floors, 500 m2 per floor (2,500 m2 total), aluminum framed windows/doors, T Bar dropped ceiling for recessed lighting, Western amenities, wide modern stairwells, no lifts; includes cost for air conditioning and electrical sanitary fit-ups, but not land.
Sources:
(1) Tilleke & Gibbins International Limited (June 2009) Website: www.tillekeandgibbins.com
(2) CBRE Research, Q1, 2009 Website: www.cbre.co.th
(3) Source Thai Co., Ltd., as of June 2009
(2) CBRE Research, Q1, 2009 Website: www.cbre.co.th
(3) Source Thai Co., Ltd., as of June 2009
Translation Costs | ||
An A4 page of technical text typewritten in Times New Roman size 12 or Cordia New size 14 as applicable | Baht | US$ |
English-Thai | 800-1,500 | 23.04-43.20 |
Thai-English | 800-1,500 | 23.04-43.20 |
Other foreign languages-Thai | 800-1,500 | 23.04-43.20 |
Thai-Other foreign languages | 800-1,500 | 23.04-43.20 |
English-Other foreign languages | 1,000-2,000 | 28.80-57.60 |
Other foreign languages-English | 1,000-2,000 | 28.80-57.60 |
Note:
1. Professional translation services are provided from and into Thai, English, Mandarin, Japanese, Korean, Arabic, Khmer, Laotian, French, German, Spanish, Italian, Portuguese, and Latin.
2. The amount indicates a maximum quote in Thai Baht.
3. Open: Monday-Friday Time: 8.00 a.m. – 4.00 p.m.
2. The amount indicates a maximum quote in Thai Baht.
3. Open: Monday-Friday Time: 8.00 a.m. – 4.00 p.m.
Source: Chalermprakiet Translation and Interpretation Center, Chulalongkorn University, as of June 2009
Information Updated 30 October 2009
Aucun commentaire:
Enregistrer un commentaire